Brick party wall in an older UK loft

Party Structure Notices: Two Months’ Notice in England, Local Help

October 13, 2026

A party structure notice is the formal document a building owner must serve under Section 3 of the Party Wall etc. Act 1996 before carrying out certain works to a shared wall or structure. The two statutory facts to hold onto are that it must be served at least two months before work starts, and an adjoining owner who does not respond in writing within 14 days is treated as having dissented.


TL;DR:

  • Section 3 covers structural work, not every job near a shared wall, such as beam cuts, underpinning, wall rebuilding, or full thickness damp proof courses.
  • Excavation near a neighboring building falls under Section 6, so one project may need a separate notice; the Act applies only in England and Wales.
  • A notice must name the building owner, describe the work specifically, and state its intended start date; special foundations require plans, sections, and load details.
  • A notice lapses if work has not begun within 12 months, unless it is being pursued with due diligence; planning and building approvals remain separate.
  • Without written consent, surveyors resolve disputes through an award governing work methods, timing, access, condition records, and costs.

Altura Surveyors
alturasurveyors.co.uk
Get Clear Guidance on Party Wall Work
Altura Surveyors provides party wall surveying across Hampshire, Surrey and Berkshire, with professional guidance tailored to your property needs.
Explore party wall surveying

Table of Contents

When does section 3 apply to your project?

Not every job touching a shared wall needs a Section 3 notice. It applies to the specific categories of work set out in section 2 of the Act, which generally involve altering, cutting into or rebuilding part of a party wall or structure.

Common examples include:

  • Cutting into a party wall to take the bearing of a beam, for example when removing a chimney breast.
  • Underpinning or raising the height of a party wall.
  • Thickening, demolishing and rebuilding a party wall or party fence wall.
  • Inserting a damp proof course that runs through the full thickness of the wall.

The Act applies in England and Wales only; other parts of the UK operate under different legal arrangements. It is also worth checking whether your project needs more than one type of notice. Excavation near a neighbouring building, for instance, falls under section 6 rather than section 3, so a single scheme of works can require separate notices rather than one covering everything.

What must a section 3 notice contain, and when are drawings needed?

Section 3(1) of the Act sets out the minimum statutory content a party structure notice must include. Leaving any of these elements vague is one of the more common sources of later disagreement.

A compliant notice must state:

  • The building owner’s full name and address.
  • The nature and particulars of the proposed work.
  • The date on which the proposed work is intended to begin.

Where special foundations are proposed, the notice must also include plans, sections and particulars of the loads to be carried, since these affect how the works bear on the shared structure. Drawings are not a strict requirement for every Section 3 notice, but Gov notes that including them where they help clarify the proposed works is good practice, and they are mandatory for some other notice types, such as section 6 excavation notices.

Pro Tip: Describe the work in specific, measurable terms (dimensions, materials, location on the wall) rather than general phrases like “building works”, since the notice defines the scope a surveyor can later rule on.

Timing and expiry: the two-month rule, 14 days, and 12 months

A Section 3 notice must be served well in advance of the proposed work to allow adequate notice time. Once served, the adjoining owner has 14 days to respond in writing with consent; silence is not acceptance.

Under section 5 of the Act, if no written consent arrives within that 14-day window, the adjoining owner is deemed to have dissented, which puts the matter into the Act’s dispute resolution procedure rather than allowing works to proceed informally.

A notice also lapses if work has not begun within 12 months of service, unless it is being prosecuted with due diligence. None of this replaces the need for planning permission or Building Regulations approval, which are separate processes entirely.

Party wall notice deadlines and response periods

How responses work: surveyors and the party wall award

Once a notice has been served, there are two broad routes forward depending on how the adjoining owner responds.

  1. Written consent: this allows the notified works to proceed without an award, though it only covers the works as described in the notice, not any later variation.
  2. Deemed dissent: if consent is not given within 14 days, the parties either agree a single impartial surveyor or each appoint their own, and those surveyors (or a third surveyor if they disagree) resolve matters through a Party Wall Award.
  3. The award itself: it typically sets out the method and timing of the works, rights of access, a record of the adjoining property’s condition before works begin, and how costs are apportioned between the parties.

Surveyors appointed under the Act act impartially rather than as advocates for whoever appointed them, and the award governs the party wall procedure only. It has no bearing on planning permission or Building Regulations compliance, which remain separate approvals the building owner must obtain independently.

Checklist for adjoining owners on receipt of a notice

If you receive a Section 3 notice as an adjoining owner, a few early checks protect your position without requiring immediate legal advice.

  • Confirm the notice correctly identifies you and your property, and record the date you received it.
  • Read the description of works and proposed start date carefully, checking they match what you understand is planned.
  • Note that only those with a qualifying legal interest count as an “adjoining owner” under the Act, so an occupier’s informal response may not satisfy the statutory requirement.
  • Take dated photographs of walls, ceilings and boundary features likely to be affected, as a record of existing condition.

Seek independent advice where the works involve underpinning, removal of structural elements, or where access to your property is being requested, since these carry more technical risk. The building owner generally covers the reasonable costs of the adjoining owner’s surveyor, subject to the usual exceptions discussed in a surveyor’s fee agreement.

Pro Tip: Keep every notice, acknowledgement and piece of correspondence together in one file from the outset: it becomes the reference point if a dispute arises later.

A practical structure for drafting your own notice

GOV.UK publishes a model Section 3 notice that works well as a starting template, provided the specific details of your project are filled in accurately.

  1. Owner and property details: your full name, address, and the address of the property carrying out the works.
  2. Adjoining owner’s details: name and address of the neighbouring property affected.
  3. Description of works: specific, measurable detail on what is being done to the shared structure.
  4. Proposed start date: at least two months from the date of service.
  5. Special foundations box: plans, sections and load particulars, where relevant.
  6. Surveyor suggestion: an optional line proposing a single agreed surveyor, which can speed matters along if accepted.

If you are also planning boundary or garden wall work alongside the party wall notice, a visual planning tool like The Backyard Wall can help you sketch layouts before finalising descriptions for the notice, though it has no bearing on the statutory wording itself. The most common pitfalls are vague descriptions, a missing or unrealistic start date, and absent particulars where special foundations are involved.

Altura Surveyors: party wall surveying across Hampshire, Surrey and Berkshire

We provide RICS-compliant party wall surveying for building owners and adjoining owners across Hampshire, Surrey and Berkshire, including the preparation of notices, condition surveys and the administration of Party Wall Awards.

Altura Surveyors

Our work on a party wall instruction typically includes:

  • Preparing or reviewing a Section 3 notice so it meets the Act’s requirements before service.
  • Carrying out a condition survey to record the existing state of neighbouring structures.
  • Acting as an impartial appointed surveyor, or administering the award process between both parties.
  • Drone inspections where roof or upper-level access is restricted, giving a clearer view of existing condition.

We produce clear, jargon-free reports within a few working days. If your project involves underpinning, structural alterations or you would simply prefer an impartial professional managing the procedure from notice to award, you can get in touch with our party wall surveying team or request a quote via our contact page.

This article is general information, not a substitute for advice from a qualified lawyer. Consult a qualified legal professional about your own circumstances before acting on anything here.

FAQ

Who typically pays for the surveyor on a party wall agreement?

The building owner carrying out the works generally pays the reasonable costs of the adjoining owner’s appointed surveyor, in addition to their own surveyor’s fees. This arrangement reflects that the adjoining owner did not initiate the works and should not be financially disadvantaged by the process.

Party fence walls, where they stand on the boundary between two properties, fall under the Party Wall etc. Act 1996 in England and Wales in a similar way to party walls between buildings. Works such as raising, rebuilding or repairing a party fence wall generally require a notice under the Act before work begins.

Can a party wall dispute occur after the works have been completed?

Yes. Disagreements can arise after completion, particularly over damage, or whether the works matched what was described in the original notice and award. A condition survey carried out before works begin, as referenced in RICS guidance, is the main tool for resolving such disputes fairly.

Can I serve my own party wall notice?

Yes, a building owner can prepare and serve a Section 3 notice without a surveyor, using the model notice published by GOV.UK as a starting point. Many owners choose to involve a surveyor regardless, particularly for technically complex works, since errors in the notice’s content can lead to delays or disputes later.

Sources

Altura Surveyors
Discuss Your Party Wall Notice
Contact Altura Surveyors to discuss party wall surveying and get guidance tailored to your property needs.

This article is general information only and is not a substitute for a survey or professional advice on a specific property. For advice on your property, contact Altura Surveyors.